PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing duct work at the 2nd floor Facing North.jpg Installing duct work at the 2nd floor Facing West.jpg Installing metal framing around the roof perimeter (South Elevation).jpg Storm piping going into the secong floor Facing West.jpg Welding clips at the North Elevation.jpg
Previous page Welding clips at the North Elevation
Welding clips at the North Elevation